Lösenord:
Kursinloggning
![]() |
Totalt: 0 kr |
Ämnesområden
Detaljplanering av tillverkning
Produktionsplanering i företag
Engelska:
Capacity Management - overview
Manufacturing Planning & Control - overview
Material Requirements Planning - overview
Material Requirements Planning - overview

To avoid a situation where parts are missing
Material requirements planning (MRP) is a system used to avoid situations where parts are missing. It establishes a schedule (priority plan) showing the components required at each level of the assembly and, based on lead times, calculates the time when these components will be needed.
This short course gives an introduction to material requirements planning; having the right material available when it is needed and not before.
Utbildningsmål:
Kursen syftar till att ge insikter i hur man arbetar med materialbehovsplanering utifrån olika tidshorisonter, produktstrukturer och lagernivåer.
Nivå:
Påbyggnad, du bör ha arbetat någon tid inom området.
Utbildningsmetod:
Material Requirements Planning - overview är en modulkurs som läses på distans över internet via vår e-learningsplatform Instant education. Läs mer om hur det fungerar här.
Utbildningens längd:Cirka 5 timmar aktiv studietid.
Fakturapris: 650 kronor / studerande.
Pris exkl. moms.
För större utbildningsprojekt; begär offert.
E-handelspris:
500 kronor / studerande
Priset är exkl. moms
Redo att lägga en beställning?
Gå då till vårt orderformulär
Boka en demo
Intresserad av att veta mer? Ring oss på 011 - 21 93 28 och boka en demo.
Kursen innehåller:
Material Requirements Planning
Material requirements planning is a system used to avoid situations where parts are missing.
Inventory Records Information
A major input to the material requirements planning system is inventory records.
Nature of Demand
There are two types of demand, independent and dependent.
Bill of Materials
The bill of material shows all the parts required to make one of the products.
Detailed Material Planning Options
The use of detailed material planning approaches depends importantly on the design characteristics of the production process.
Time-Phased Planning
Time-phased planning for individual components is carried out with material requirements planning approaches.
Exploding and Offsetting
This is the process of multiplying the requirements by the usage quantity and then placing them in their proper period based on lead time.
Gross and Net Requirements
Calculating quantities to be produced or purchased.
Releasing Orders
Authorization to buy or to make the required components needed in the material requirement planning.