Capacity Management - overview
Manufacturing Planning & Control - overview
Material Requirements Planning - overview
Material Requirements Planning - overview

To avoid a situation where parts are missing
Material requirements planning (MRP) is a system used to avoid situations where parts are missing. It establishes a schedule (priority plan) showing the components required at each level of the assembly and, based on lead times, calculates the time when these components will be needed.
This short course gives an introduction to material requirements planning; having the right material available when it is needed and not before.
Objectives:
This course aims to provide insights into how to work with material requirements planning based on different time horizons, product structures and inventory levels.
Level:
Supplementary, you should have worked in the area for some time.
Training Method:
Material Requirements Planning - overview is a Module course and is studied over the internet via our e-learning platform Instant education. Read more about the training method here.
Course Length:Approximately 5 hours active study time.
Price: 70 EURO / student
78 USD / student
Prices excluding VAT.
For large-scale education projects request quotation.
Online price:
55 EURO / student
61 USD / student
Prices excluding VAT.
Ready to place your order?
Then go to our order page
Course contents:
Material Requirements Planning
Material requirements planning is a system used to avoid situations where parts are missing.
Inventory Records Information
A major input to the material requirements planning system is inventory records.
Nature of Demand
There are two types of demand, independent and dependent.
Bill of Materials
The bill of material shows all the parts required to make one of the products.
Detailed Material Planning Options
The use of detailed material planning approaches depends importantly on the design characteristics of the production process.
Time-Phased Planning
Time-phased planning for individual components is carried out with material requirements planning approaches.
Exploding and Offsetting
This is the process of multiplying the requirements by the usage quantity and then placing them in their proper period based on lead time.
Gross and Net Requirements
Calculating quantities to be produced or purchased.
Releasing Orders
Authorization to buy or to make the required components needed in the material requirement planning.